Sign In | Join Free | My frbiz.com |
|
Brand Name : ForPro
Model Number : customized
Certification : ISO and CE
Place of Origin : shanghai
MOQ : 20 Pin
Payment Terms : L/C, T/T
Supply Ability : 10000 PIn / year
Delivery Time : 30-45 work days
Packaging Details : Pallet
Material : Q235 Steel, timber beam,Plywood
Color : Yellow,Blue,Black
Size : Maximum formwork height of up to 6.0 m
Application : Building Construction, wall and column concrete construction, Pier,Bridge,Super high-rise building etc
Product name : Concrete Steel Formwork
Type : Wall Formwork, Steel formwork,Column formwork,Climbing formwork
Surface : Galvanized
Sample : Welcome,Free
High Turnover CF220 Climbing Formwork for LNG Tower and Bridges Concrete Pouring
Description
Climbing Formwork CF220 is a crane lift climbing system and support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 6.0 m.
Features
* Formwork panel can be retracted back 60cm from the concrete wall
* Formwork panels and climbing brackets are pre-assembled one time and can be reused many times.
* CF220 climbing formwork is safely anchored on concrete structure during formwork adjustment and concreste surface repairment.
The Concrete Pouring Process
Applications
Factory
![]() |
LNG Tower Climbing Formwork System With Crane Lifted ISO CE Certificate Images |